The maximum short-circuit current refers to the maximum allowable current measured by short-circuiting the positive and negative terminals. On the other hand, the maximum input current pertains to the maximum output current value that allows the string to operate normally.
Yes, it can have an impact. The MPPT algorithm aims to find the maximum power point by adjusting the voltage. When one string of components is occluded, it results in a decrease in voltage for the affected string. This situation can lead to the presence of two power peak points, causing the MPPT tracking point to be lower than usual, which ultimately reduces the overall power generation efficiency.

To ensure your safety and the proper functioning of your equipment, it's important to follow the correct sequence of steps when dealing with power outages and grid connections. During a power outage at the power station, it's recommended to turn off the DC switch (module side) first, followed by the AC switch (inverter side). On the other hand, when connecting to the grid for power transmission, it's important to first close the AC switch and then the DC switch. Remember, the order of operations for power outages and transmission is reversed, so it's essential to follow the correct sequence to avoid any potential hazards.

1. Loosen the waterproof protective cover at the connection between the device and the T-junction joint;

2. Use special tools to remove the confinement screws;

3. Unplug the equipment connector and the T-junction joint;

To replace the faulty device, follow these steps:

1. Use the APP background to locate the faulty device;

2. Verify the equipment's fault on-site;

3. Disconnect the AC side circuit breaker;

4. Disconnect the component from the device;

5. Disconnect the AC side cable from the T-junction connector;

6. Remove the faulty device and replace it with a new one;

The process of power connection is the opposite of the above process.

Grid Connection Process:

1-) Ensure all cables are properly connected.

2-) Close the AC side circuit breaker.

3-) Allow the equipment to self-test and connect to the grid.

The grid disconnection process is the reverse of the grid connection process.