To ensure your safety and the proper functioning
of your equipment, it's important to follow the correct sequence of steps when
dealing with power outages and grid connections. During a power outage at the
power station, it's recommended to turn off the DC switch (module side) first,
followed by the AC switch (inverter side). On the other hand, when connecting
to the grid for power transmission, it's important to first close the AC switch
and then the DC switch. Remember, the order of operations for power outages and
transmission is reversed, so it's essential to follow the correct sequence to
avoid any potential hazards.
1. Loosen the waterproof protective cover at the
connection between the device and the T-junction joint;
2. Use special tools to remove the confinement
screws;
3. Unplug the equipment connector and the
T-junction joint;
To replace the faulty device, follow these steps:
1. Use the APP background to locate the faulty
device;
2. Verify the equipment's fault on-site;
3. Disconnect the AC side circuit breaker;
4. Disconnect the component from the device;
5. Disconnect the AC side cable from the
T-junction connector;
6. Remove the faulty device and replace it with a
new one;
The process of power connection is the opposite
of the above process.
Grid Connection Process:
1-) Ensure all cables are properly connected.
2-) Close the AC side circuit breaker.
3-) Allow the equipment to self-test and connect
to the grid.
The grid disconnection process is the reverse of
the grid connection process.